Time Lapse of a Driveway Peel & Pave



1542
4400758

New driveway installed by Ottawa Pavemasters on June 5, 2015. The whole process took about 3 hours but I've used time lapse to speed that up to just over 7 minutes. The driveway had begun to fail with large cracks, holes, and areas that were only about 1/2" thick when the old driveway was pulled up. You can see the failure of the driveway on the right hand side just above the wet spots on the asphalt. Rather than having it get worse through another Canadian winter, it was replaced. The cost was around $2400 CAD.

Published by: Todd Bower Published at: 8 years ago Category: مسافرت و حوادث